138kV Relocation

Indiana | 2023

The Hydaker-Wheatlake Co. crews performed the rebuild and relocation of existing 138 kV line in near downtown Indianapolis. The project included installation of new steel poles on drilled pier foundations and pulling new conductor over the White River with the aid of a drone.

RETURN TO PROJECTS