Single Circuit & Double Circuit Transmission

Iowa | 2023

The Hydaker-Wheatlake Co. crews performed the green build of 20.47 miles of 161/69 kV double circuit transmission with 1.79 miles of single circuit 69kV transmission and 1.62 miles of 12.5kV 3PH underbuild.